Greening of Existing Buildings
We bring a great depth of knowledge to the challenge of greening existing buildings. In fact, we have developed a comprehensive process to help owners and operators perform gap analyses and achieve green certification.
Audit Experience: Level 2&3 Energy Audits Performed
# | Building | ASHRAE Level | Client | # Bldgs | Area | Dates |
1 | Eureka Station, Nunavut | 3 | ECCC/NRCan | 12 | various | Sep – Dec 2018 |
2 | Plantagenet EMS Station | 2 | UCPR | 1 | Aug-Sep 2019 | |
3 | DND Carling B2 | 2 | PSPC | 1 | 11,174M2 | Jan-Mar 2016 |
4 | DND Carling B10E | 2 | PSPC | 1 | 8,491 M2 | Jan-Mar 2016 |
5 | DND Carling B10W | 2 | PSPC | 1 | 12,972 M2 | Jan-Mar 2016 |
6 | DND Carling Parkade | 2 | PSPC | 1 | 14,000 M2 | Jan-Mar 2016 |
7 | US Embassy Chief Residence | 3 | US Embassy | 1 | 1,286 M2 | Sep 2016 – Feb 2017 |
8 | US Embassy Deputy Residence | 3 | US Embassy | 1 | 796 M2 | Sep 2016 – Feb 2017 |
9 | 2171 Thurston Dr | 2 | Richcraft | 1 | 3,912 M2 | Aug-Sep 2017 |
10 | Paul J. Yakabusky Community Centre | 3 | TWP. of Madawaska Valley | 1 | Aug-Dec 2016 | |
11 | Embrun Municipal Garage | 2 | County of Prescott Russell | 1 | 330 M2 | June 2017 |
12 | CAA Regional Operations Centre | 2 | Canadian Automobile Association | 1 | 3,134 M2 | May-Jul 2015 |
13 | Ann Manor Condominiums | 2 | Condominium Management Co. | 1 | 10,759 M2 | Oct-Dec 2012 |
14 | 495 Richmond Road | 2 | Canderel | 1 | 13,953 M2 | Apr-Jun 2012 |
15 | Canadian Mothercraft | 2 | Mothercraft | 1 | 1,674 | Sep-Nov. 2012 |
16 | Plant 301 | Industrial | 3M Canada | 1 | 55,760 M2 | Jun-Sep 2011 |
17 | Perth Soap Plant | Industrial | Trillium Health Care Products | 1 | 23,255 M2 | Mar-Jul 2011 |
18 | 350 King Edward St. | 2 | PWGSC | 1 | 11,531 M2 | Feb-Mar 2011 |
19 | Fundy National Park building portfolio | 2 | Parks Canada | 11 | 5,580 M2 | Jun-Aug 2011 |
20 | Kouchibouquac National Park | 2 | Parks Canada | 2 | 1,395 M2 | Jun-Aug 2011 |
Implementation Experience: Sample Upgrade Projects
- 212 Bronson Ave., Ottawa – Make-up air and boiler system replacement
- 207 Bell St. N., Ottawa – Combined heat & power system + absorption chiller
- National Research Council – Net Zero Test House
- 540 Thomson St., Ottawa – Solar air heating system
- 222 Somerset St, Ottawa office building – Building automation system
- 25 Nicholas St, Ottawa Office building – Cooling tower replacement & building automation system (on-going)
- Canadian Border Services Agency – Modifications to modular pistol range HVAC systems
- Department of National Defense – Back-up cooling system for UPS room
- Joseph’s Parish – Heating and ventilation system replacement and upgrades
- Dominion Chalmers United Church – Building addition and air-conditioning of Sanctuary
- Joseph’s High School, Renfrew, ON – building addition
- National Capital Commission, O’Brien House – complete renovation of historic building
- Civic Centre, Nepean Sportsplex, Carp Arena, Navan Arena – Ice plant heat recovery analysis and business case development.
- Lawrence Islands National Park, Parks Canada – Utility buildings heating system upgrades assessment
- Trillium Health Care –industrial heat recovery ventilation system
Green Building Experience: Sample Renewable Energy Projects
- City of Greater Sudbury – Building portfolio photovoltaic power systems
- Drouin Farms – Design engineering for 250kW rooftop photovoltaic power system
- Ameresco Canada – Verification engineering for 1.2MW rooftop photovoltaic power systems across numerous school buildings.
- Johnson Controls International – Design engineering for 5MW photovoltaic power system
- Dryden Public School – Design engineering for 30kW rooftop photovoltaic power system
- City of Dryden – Connection Impact Assessment for 10MW ground mounted photovoltaic power system
- Enfinity Canada – rooftop photovoltaic power pilot systems
- Photowatt – provided financial analysis and preliminary design services for 10MW photovoltaic systems
- Uni-Solar – provided design services for 375kW photovoltaic system
- Waste Management Canada – Feasibility study for photovoltaic installations on various WM facilities.
- Private Residence – Design engineering for 10kW wind generator, 5kW photovoltaic and solar thermal heating systems
- Rideau Canal System (Parks Canada) – Design engineering for 3.0kW grid connected photovoltaic power system
- Lawrence Islands National Park – Design engineering for stand-alone hybrid wind / photovoltaic power system for two historic buildings
- Fundy National Park – Design engineering for solar thermal heating for saltwater public swimming pool & bath house
- Lawrence Islands National Park – Design engineering for 5.4kW grid connected photovoltaic power system
- Agriculture Canada – Solar powered irrigation system, Central Experimental Farm